From The Anvil 83778 Octagonal Centre Door Knob; 80mm Diameter; Pewter (PE)£67.75 ex. VAT (£81.30 inc. VAT)
£67.75 ex. VAT (£81.30 inc. VAT)
From The Anvil 83779 Octagonal Centre Door Knob; 80mm Diameter; Black (BK)£58.91 ex. VAT (£70.69 inc. VAT)
£58.91 ex. VAT (£70.69 inc. VAT)
Carlisle M60 Round Centre Door Knob; 68mm Diameter Knob; 81mm Diameter Rose; 80mm Protrusion; Satin Chrome Plated (SCP)£32.64 ex. VAT (£39.17 inc. VAT)
£32.64 ex. VAT (£39.17 inc. VAT)
Heritage V900 Centre Door Knob; 76mm (3") Diameter; 80mm ProjectionFrom £37.25 ex. VAT (£44.70 inc. VAT)
From £37.25 ex. VAT (£44.70 inc. VAT)
Heritage V901 Centre Door Knob; 68mm (2 3/4") Diameter; 80mm ProjectionFrom £32.20 ex. VAT (£38.64 inc. VAT)
From £32.20 ex. VAT (£38.64 inc. VAT)
Jedo JAB6 Centre Door Knob; 64mm; Antique Black (AB)£10.75 ex. VAT (£12.90 inc. VAT)
£10.75 ex. VAT (£12.90 inc. VAT)
Kirkpatrick 3370 Octagonal Centre Door Knob; 73mm (2 7/8"); Plate 76mm (3"); Black (BK)£43.70 ex. VAT (£52.44 inc. VAT)
£43.70 ex. VAT (£52.44 inc. VAT)
Carlisle M60 Round Centre Door Knob; 68mm Diameter Knob; 81mm Diameter Rose; 80mm Protrusion; Polished Brass (PB)£28.61 ex. VAT (£34.33 inc. VAT)
£28.61 ex. VAT (£34.33 inc. VAT)
Shop by Brand
Filter By
This item is currently out of stock. Regrettably, as we cannot quote an acceptable lead time, we are unable to accept on-line orders.
Currently we have [remaining-stock] units of this item in stock. Any additional quantity ordered will be placed on back order.[lead-time-start] Our normal lead time for this item is just [lead-time] working days.[lead-time-end]
We are currently unable to accept on-line orders for more than the available stock quantity of [remaining-stock]. Please use the Haggle tab to enable us to quote price and availability for larger quantities.
You must order at least [min-order-qty] of this product.
You must order at least [min-order-qty] of this product. We currently hold [remaining-stock] in stock. The remainder will be put on back order.[lead-time-start] Lead time [lead-time] day(s).[lead-time-end]